Grillage Design of the DolWin3 Jacket East Transport

For the transport of the Jacket East of the DolWin3 project, MOCS delivered the basic and detailed design of the grillage structure. The grillage is designed to transfer the loads from the jacket to the strong points of the transport barge. The analysis is executed by means of Finite Element Analysis using the commercial package ANSYS Workbench. Finally construction drawings have been delivered to the client for production of the complete grillage structure.

Martijn BaasGrillage Design of the DolWin3 Jacket East Transport